![AMI 205 Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/ami/205/205_operators-manual_2932225024.webp)
M O D E L 2 0 5
O P E R A T O R ’ S M A N U A L
20
20
20
20
4.2 INITIAL POWER ON
Before proceeding with POWER ON it is EXTREMELY important to have a basic
understanding of SYSTEM FUNCTIONS. Read Section 4.1 - System Functions before
proceeding.
1. Before connecting or energizing the AC power verify that all input power set up
requirements of Section 3.0 have been complied with.
2. Connect the AC power cable to the AC source and to the 115/230 VAC INPUT
connector
on the Model 205. Move the circuit breaker to the ON position.
3. If the Model 205-CW is installed connect the AC cord to 110 or 220 VAC, single phase
power. Set the ON/OFF switch to the ON position.
Note
The Model 205-CW contains a flow sensor. The green lamp indicates that there is
sufficient flow. If this lamp goes out either the water level is too low or there is a
blockage in the line. Add coolant or clear the blockage before continuing to weld.
4. Boot-up and display the HOME screen takes approximately one minute.