4
III. STEPS OF INSTALLATION
A. Location of installation
Check and insure the installation location (concrete, layout, space size etc.) is suitable for
lift installation.
B. Check the parts before assembly
1. Packaged lift and hydraulic power unit
(See Fig. 4)
2. Take off the packaging on the machine
Take off the packing rack.
3. Move aside the parts and check the parts according to the shipment parts list
(See Fig.5
& 6)
Fig.4
Shipment list
Fig.5
Содержание SPL-6
Страница 1: ...Single post Parking Lift Model SPL 6 Original ...
Страница 15: ...13 IV EXPLOEDED VIEW Fig 22 ...
Страница 20: ...18 3 Power Unit 071103 Exploded View 110V 60HZ 1 Phase Manual Fig 25 ...
Страница 22: ...20 220V 60HZ 1 Phase Manual Fig 26 8 Manual Power Unit 071104 Exploded View ...
Страница 29: ...Address 1931 Jo Rogers Blvd Manning South Carolina USA No 72210501 Date 2022 10 ...