![AMGO DX-12A Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/amgo/dx-12a/dx-12a_installation-and-service-manual_2932072038.webp)
36
4. Lower both platforms of the secondly scissors to the lowest position.
a. Turn the Two-way valve to oil filling position (
See Fig. 38
), push button
UP for
secondly scissors
and fill oil to the secondly cylinder until full, and then hold down
the button
LOCK for secondly scissors
for a while for bleeding air. Repeat these
steps until no air in the hydraulic system(normally repeat two time the air will be
bleed off).
b. Turn the Two-way valve to normal working position (
See Fig. 39
), push button
UP
for secondly scissors
to rise the lift, check if both platforms are at the same height,
if not, do the synchronous adjustment till the two safety devices can be locked or
released at the same time
.
Normal Working Position
Fig. 37
Oil Filling Position
Fig.
36
Power switch
Buzzer H
PASS
Lower
alarm
button
LOCK (secondly scissors)
Indicator light
LOCK (main scissors)
DOWN (main scissors)
UP (secondly scissors)
DOWN (secondly scissors)
UP (main scissors)
For main scissors
For secondly scissors
Содержание DX-12A
Страница 1: ...1 SCISSORS LIFT Model DX 12A Original...
Страница 16: ...14 1 2 Circuit Diagram See Fig 19 Fig 19...
Страница 19: ...17 2 2 Circuit Diagram See Fig 21 Fig 21...
Страница 29: ...27 4 1 MAIN SCISSORS LIFT CYLINDERS Fig 31 Add grease to lubricate regularly Add grease to lubricate regularly...
Страница 31: ...29 4 2 SECONDLY LIFT CYLINDER Add grease to lubricate regularly Add grease to lubricate regularly Fig 32...
Страница 33: ...31 4 3 CONTROL CABINET 10580125 Single phase Fig 33...
Страница 35: ...33 4 4 POWER UNIT Part No 071205 Fig 34 220V 60HZ 1 PHASE...