![AMGO AX-12 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/amgo/ax-12/ax-12_installation-and-service-manual_2932071041.webp)
39
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust the platform as necessary to insure level lifting.
3. Check all fastener and re-torque.
For Secondly Cylinder
(3 moving parts)
Fig.51
For shaft of piston rod of
Secondly cylinder
(1 moving parts)
Fig.52
Содержание AX-12
Страница 1: ...1 SCISSORS LIFT Model AX 12A AX 12 Original...
Страница 13: ...11 4 2 Parts bag for flush mount installation See Fig 19 Fig 20 For AX 12A For AX 12 Fig 19 Fig 20...
Страница 28: ...26 MODEL AX 12 Fig 39...
Страница 32: ...30 CYLINDERS Fig 40 Add grease to lubricate regularly Add grease to lubricate regularly...
Страница 34: ...32 CONTROL CABINET 73 76 82 71 80 81 Fig 41...