3
B. SPECIFICATIONS OF CONCRETE
(See Fig. 3)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness
4”
minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level and no cracks.
C. POWER SUPPLY
The electrical source must be
2.0HP
minimum. The source cable size must be
2.5mm²
and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Check the parts before assembly
1. Packaged lift and Hydraulic Power Unit
(See Fig. 4)
.
Fig. 4
Fig. 3
Concrete intensity must be 3,000psi (210kg/cm²)
minimum.
Optional
Plastic oil tray
Содержание 408-P
Страница 1: ......
Страница 25: ...23 IV EXPLODED VIEW Model 408 P Fig 36 ...
Страница 26: ...24 CROSS BEAM CYLINDERS 3 Fig 37 Fig 38 Fig 38 ...
Страница 27: ...25 Manual power unit 110V 60HZ Single phase Fig 42 Fig 39 ...
Страница 37: ......