9
F. Install power side platform.
1. Install the power side platform on the cross beams by a fork lift or manual, offset the
cross beams to the outside till the pulleys of both platforms can rest into the cross
beams’ slots
(See Fig.15)
, Install the power side platform and screw up the bolts.
Fig. 16
Offset the cross beam lean outward
when putting the powerside
platform on the cross beams
Offset the cross beam lean
outward when putting the
powerside platform on the cross
beams
Содержание 408-P
Страница 1: ......
Страница 25: ...23 IV EXPLODED VIEW Model 408 P Fig 36 ...
Страница 26: ...24 CROSS BEAM CYLINDERS 3 Fig 37 Fig 38 Fig 38 ...
Страница 27: ...25 Manual power unit 110V 60HZ Single phase Fig 42 Fig 39 ...
Страница 37: ......