4
III. STEPS OF INSTALLATION
A. Location of installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Check the parts before assembly
1. Packaged lift and hydraulic power unit
(See Fig. 4)
.
2. Open the outer packing carefully
(See Fig. 5)
.
Shipment Parts List
3. Take off the drive-in ramps and columns
(See Fig. 6)
.
4. Loose the screws of the upper package stand, take off the offside platform, take out
the parts inside the powerside platform, than remove the package stand.
Fig.
4
Powerside Platform
Drive-in Ramp
Offside Platform
Cross Beam
Column
Fig.
5
Fig.
6
Parts Box
Содержание PRO-12ASX
Страница 1: ...0 FOUR POST LIFT Model PRO 12ASX...
Страница 8: ...6 7 Check the parts of the parts bag according to the parts bag list See Fig 9 Fig 9 Parts bag NO 2...
Страница 10: ...8 D Install cross beams See Fig 11 Fig 1 3 1 3 Fig 12 Hole towards inside 2 Fig 11...
Страница 24: ...22 IV EXPLODED VIEW Model PRO 10A Fig 34 53 55 54 32 12 43 59 79 51 50 49 2 3 78 44 1 203 80 45 57 4 56 18 8 52...
Страница 25: ...23 CROSS BEAM CYLINDERS Fig 44 Fig 36 3...
Страница 36: ...34 72149601 2018 11...