3
III. STEPS OF INSTALLATION
A. Check the parts before assembly, make sure all the parts are completed.
1.
Packaged lift, Parts box, Power Unit and Power Unit Stand.
Move aside the parts, Open the outer packing and check the parts according to the
shipment parts list
(See Fig. 3)
.
2. Open the parts box, check the parts according to the part list
(See Fig. 4)
.
Fig. 3
Fig
. 4
33