31
Section 2. Installation
Basic Setup Procedure
for a summary of the basic setup procedure and an overall view of the
information in this section. Use the procedure as a quick reference if you are familiar
with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to sections which contain more details.
Execute each step in the sequence given.
Table 2.1
Basic Setup Procedure
Step # Description Action
Reference
1
Inspection
Perform an initial physical
inspection of the supply.
2
Installation
Install the supply (bench or rack
mount); ensure adequate
ventilation.
3
Input Power
Connect AC input power.
4
Test
Perform functional tests for voltage
mode operation, current mode
operation, and front panel controls.
5
Load
Connect the load.
6
Sensing
Connect sensing lines.
Содержание Sorensen XHR 100-10
Страница 2: ......
Страница 4: ...This page intentionally left blank ii ...
Страница 6: ...This page intentionally left blank iv ...
Страница 8: ...This page intentionally left blank vi ...
Страница 12: ...List of Figures x Operating Manual for XHR Series Power Supply ...
Страница 14: ...List of Tables xii Operating Manual for XHR Series Power Supply ...
Страница 47: ...Installation Load Connection 47 Figure 2 9 Multiple Loads with Remote Sensing ...