It is recommended to connect the PCD 8 s through a properly rated power switch device, which should be
located close to the test setup. To ensure an easy and quick access to the EUT power, the switch should be
clearly and visibly labelled as a device for «EUT power on/off» switching. The inhouse power distribution needs
to be equipped with a proper circuit breaker and an emergency off button as per IEC 61010-1.
Leakage current
Local installation regulations must be respected to ensure the safe flow of leakage currents. Use only nationally
approved connectors and accessory items.
Ensure that a reliable return path for the interference current is provided between the EUT and the coupling
network. The reference ground plane and the earth connections to the instruments as described in the relevant
test standards serve this purpose well.
Earth connection
The earth connection terminal ensures a positive link to the copper earth rail connected on the CDN housing.
On the CDN unit «EUT power out» side it is electrically connected to the middle connection, identified by «earth
connection» symbol. In case of a test installation with a solid earth (e.g. a Faraday cage), this earth terminal can
be used to form a star-connection point for the earth wires of the test setup.
EUT Supply protection
Dimensioning of EUT supply and rating of fuse protection (AC or DC), must conform with National prescriptions
and EUT requirements. An inappropriate arrangement, mounting, cabling and/or handling of the device under test
or the protective elements can make the protective features that are incorporated in the concept of the device
worthless.
NOTE
The in-house power distribution needs to be equipped with a proper circuit breaker and an emergency
off button as per IEC/EN 61010-1.
NOTE
Do not mismatch the EUT power input of the CDN and the EUT power output. Use only the delivered
isolated allen key to screw the cables to the terminals. Never touch the terminals during the EUT power
is on.
Содержание PCD 8 S Series
Страница 37: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 37 53 ...
Страница 38: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 38 53 9 Coupling guide 9 1 IEC coupling Line to Ground 9 µF ...
Страница 39: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 39 53 9 2 IEC coupling Line to Line 18 µF ...
Страница 40: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 40 53 9 3 Optional IEC coupling Lines to Ground 9 µF 1 3 ...
Страница 41: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 41 53 9 4 Optional IEC coupling Lines to Ground 9 µF 2 3 ...
Страница 42: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 42 53 9 5 Optional IEC coupling Lines to Ground 9 µF 3 3 ...
Страница 43: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 43 53 9 6 Optional ANSI coupling 1 5 Basic ...
Страница 44: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 44 53 9 7 Optional ANSI coupling 2 5 Basic ...
Страница 45: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 45 53 9 8 Optional ANSI coupling 3 5 Supplemental ...
Страница 46: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 46 53 9 9 Optional ANSI coupling 4 5 Supplemental ...
Страница 47: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 47 53 9 10 Optional ANSI coupling 5 5 Diagnostic ...
Страница 52: ......
Страница 53: ...AMETEK CTS PCD 8 s series Manual of operation V 1 00 53 53 ...