
Setting Up the Machine and Hardware
7
LD Series Operation Manual
Setting Up the Machine and Hardware
UNPACKING
All packing material should be carefully removed from the testing machine and a careful visual inspection should be made to ensure that there is no obvious
transit damage. The following standard items should be in this package:
•
Material testing frame
•
Control console
•
Power input cable
•
Appropriate grip/adapter pins and anchor pins
•
1 x "C" spanner; 1 x 5 mm Allen key
Some of the following optional equipment may also be included with your machine:
•
Nexygen
Plus
4 software package
•
Load cell
•
Gripping fixture
If there is any damage or parts missing, please report this to your dealer or to AMETEK without delay.
SETTING UP THE LD SERIES
If this equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired. The LD Series should be in-
stalled in an area where adequate lighting is present in order to ensure safe use. Ensure adequate ventilation. Do not block airflow to fans or vents on the enclosure.
Note:
Do not position the LD Series so that it is difficult to operate. The mains supply machine socket should be easily accessible so that the mains power may
be disconnected in case of an emergency.
The LD Series is a heavy machine and great care should be taken in choosing the location where it is installed. If it is to be bench mounted, ensure that
the bench is capable of remaining firm and stable, and able to withstand the combined weight of the machine and any mounted accessories. See
Specifi-
cations on page15
for the weight of the LD Series. The LD Series must be vertical, whether bench or floor mounted. If not vertical, results may be affected,
particularly for very low load.
!
CAUTION:
The LD Series must be positioned so that the front of the machine can be easily accessed. The Emergency Stop Button MUST NOT BE
OBSTRUCTED in any way.