Universal IV - Level Measurement System
8
1.7 Wiring the Electronic Unit
• Signal connections are made to the 3 terminal block on
the front of the chassis
• Due to low power consumption, only light gauge wiring
is needed; shielded twisted pair cables recommended
• Integral units are pre-wired to the sensing element at
the factory. See Figure 2-5
• See Figure 2-6 for wiring connections to the remote unit
• The cable from the sensing element is connected to the
terminal strip below the instrument chassis
CAUTION
- Before using Intrinsic Safety Barrier read
manufacturer instructions for barrier operation
Figure 1-5
Universal IV Wiring Connections