SECTION 2 - OPERATION 2-1
Section 2 – Operating Instructions
Training
On site training classes are available. For more information, contact our Sales Department at
Chandler Engineering.
Preparing the Instrument for a Test
Prior to running a test, the following steps must be performed
.
Configuring the Consistency Display
1.
Turn on the instrument.
2.
Press
or
(Up or Down) to change the alarm limit.
A manual has been enclosed for your reference.
Programming the Temperature and Pressure Controllers
The programming for the temperature and pressure controllers is identical. Following is a
brief procedure for programming the controllers. For complete instructions, see the Model
8050/8051 Temperature Controller and Model 8060/8061 Pressure Controller manuals.
1.
Press and hold the Advance key
for approximately five seconds. The profile prompt
(ProF) will appear in the lower display and the profile number (e.g. P1) appears in the
upper display.
2.
Multiple profiles (P1 to P4) can be stored in the device. The shortcut keys (EZ1 and EZ2)
are factory configured to start and stop profile P1. The 5270 DACS software also utilizes
P1 when a profile is downloaded to the controller for an automated test. Press the Up
or Down
keys to select P1.
3.
Press the Advance Key
to move to the first step.
4.
Press the Up
or Down
keys to move through and select the step type.
5.
Press the Advance Key
to move through the selected step settings.
6.
Press the Up
or Down
keys to change the step settings.
7.
Press the Infinity Key
at any time to return to the step number prompt.
8.
Press the Infinity Key
again to return to the profile number prompt.
9.
From any point press and hold the Infinity Key
for two seconds to return to the Home
Page.
10.
To manually start or stop a profile, press either the EZ1 or EZ2 key.
API Slurry Cup Preparation
For an accurate thickening time test to be performed, it is important for the slurry cup to be
properly maintained and prepared. The following procedure should serve as a guideline for
slurry cup preparations. While assembling the slurry cup, refer to drawing 07-0031 in the
Содержание Chandler Engineering 8040D10
Страница 8: ...P 4 PREFACE This page is intentionally left blank ...
Страница 24: ...3 8 MAINTENANCE OF CONSISTOMETER This page is intentionally left blank ...
Страница 28: ...4 4 TROUBLESHOOTING This page is intentionally left blank ...
Страница 32: ......
Страница 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 8040 DWGS REV A This page is intentionally left blank ...
Страница 35: ......
Страница 40: ......
Страница 41: ...CHANDLER ENGINEERING ...
Страница 42: ...CHANDLER ENGINEERING ...
Страница 43: ...CHANDLER ENGINEERING ...
Страница 44: ...CHANDLER ENGINEERING ...
Страница 45: ...CHANDLER ENGINEERING ...
Страница 46: ...CHANDLER ENGINEERING ...
Страница 47: ......
Страница 50: ...CHANDLER ENGINEERING ...
Страница 51: ...CHANDLER ENGINEERING ...
Страница 52: ......