background image

 SECTION 6 – DRAWINGS AND SCHEMATICS     6-1 

 
 

-????-DWGS   REV A 

 

Section 6 - Drawings and Schematics 

 
 

Drawing Number 

Description 

30-0048 

Modified Blending Assembly 

3065-0001 

Wettability Tester Model 3065 

3065-0013  

Schematic Wiring, 110V   

3065-0014  

Schematic Wiring, 220V  

3065-0027 

Assembly Heater, Jacket 

3065-0112 

Assembly, Slurry Cup 

 
 

Содержание Chandler Engineering 3065

Страница 1: ...MANUAL MODEL 3065 Wettability Tester Revision F January 2016 P N 3065 0009 S N ____________ 614007 25 72 40 7 342 262 85 56 7 342 262 85 60 email office techimport ru www techimport ru i i i i v v i...

Страница 2: ...sumes no responsibility for errors or omissions Neither is any liability assumed for damages resulting from the use of the information contained herein This publication contains the following trademar...

Страница 3: ...quired 1 1 Setting up the Instrument 1 1 Section 2 Operating Instructions 2 1 Sample Preparation for Wettability Test 2 1 Model 3065 Wettability Test Procedure 2 1 Mixing a Cement Slurry 2 2 Section 3...

Страница 4: ...T 2 TABLE OF CONTENTS This page is intentionally left blank...

Страница 5: ...rnal fluid to be used in the testing generally a spacer or pre flush is used to establish a reference conductance using the Span control The conditioned oil based oil external fluid is placed in the p...

Страница 6: ...perature 194 F 90 C Input Voltage 110 or 220 VAC 15 50 60 Hz 10 Heater Wattage 280 Watts Dimensions 27 6 70cm high x 11 28cm wide x 16 41cm deep Shipping Dimensions 32 81cm high x 16 41cm wide x 26 66...

Страница 7: ...ore attempting instrument operation Observe caution notes Observe and follow the warning labels on the instrument Never exceed the instrument maximum temperature ratings Always disconnect main power t...

Страница 8: ...P 4 PREFACE This page is intentionally left blank...

Страница 9: ...mixing cup and fasten the Velcro strips 5 Plug red and black test leads into mixing cup the leads are interchangeable between the receptacles it is only necessary that they both be plugged in 6 Plug t...

Страница 10: ...1 2 SECTION 1 INSTALLATION Figure 1 Viewed from the back of the instrument...

Страница 11: ...ing the temperature controller 4 Preheat cup to desired test temperature 5 When the water reaches the desired temperature pour it out and place enough pre heated spacer in the cup to reach 1 above the...

Страница 12: ...ing the small buttons below each digit 5 Turn the MASTER switch to ON red power light lit Press the Mix 1 button 6 Press the Red START RESET button The motor will operate at 4 000 rpm 7 Add the measur...

Страница 13: ...Care should be taken to clean between the heating jacket and cup if fluid is spilled or splashed First remove the nut on the bottom outside with a 7 8 socket Pull the blade assembly through the cup R...

Страница 14: ...Motor Clean Check and Replace Blending Blade Per API Spec 10 Recommendation Inspect the blending assembly for blade wear and leaks Inspect Change o ring in the Blending Assembly When broken Thermocou...

Страница 15: ...f these symptoms are present the cause of the problem will most likely be found in the speed transducer circuit 1 To verify that the tachometer is working properly connect a 6000 Hz 0 5 vdc square wav...

Страница 16: ...c depending on the speed setting of the mixer Faulty SCR Voltage Regulator Module If the SCR Voltage Regulator module is suspected to be faulty check the fuse under the SCR Voltage Regulator Replace i...

Страница 17: ...couple is plugged in and functioning properly Conductivity probe is not functioning 1 Check to see that leads are completely plugged into mixing cup and that probe is plugged into the Control Enclosur...

Страница 18: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...

Страница 19: ...liter 3065 0012 Modified Blender Cup 3065 0020 Test Lead Assembly 3065 0021 TC 1 00 Long 3065 0027 Heater Jacket Assy W O T C C07709 Washer SS C07710 Washer Rubber P 1662 Fuse 2 Amp 250V 3AG Fast Blo...

Страница 20: ...5 2 SECTION 5 REPLACEMENT PARTS 3065 REPL_PARTS REV C This page is intentionally left blank...

Страница 21: ...6 Drawings and Schematics Drawing Number Description 30 0048 Modified Blending Assembly 3065 0001 Wettability Tester Model 3065 3065 0013 Schematic Wiring 110V 3065 0014 Schematic Wiring 220V 3065 00...

Страница 22: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS DWGS REV A This page is intentionally left blank...

Страница 23: ...8 8 11 9 9 9 9 6 10 BLENDING CONTAINER A A COMPANY LLC 2 2 D B D C 6 B PROJ Imported Data Set C TYPE 05 12 15 CHANDLER ENGINEERING A 1 A ENGR TRB SIZE B 5 12 2015 TITLE BLOCK REV 3 3 THIRD ANGLE PROJ...

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ...CHANDLER ENGINEERING...

Страница 28: ...CHANDLER ENGINEERING...

Страница 29: ......

Страница 30: ...IL 1 11 3065 0021 TC 1 00 LONG 1 12 C12228 HOT SURFACE WARNING LABEL 1 13 C00595 ORING VITON AS006 V75 4 14 QX C 1029 ORING 2 008 VITON 2 A 1 A BREAK EDGES DEBURR UON DIMS ARE IN INCHES 1 PLC 0 030 2...

Страница 31: ...999 s 99 min 59 s 99 99 min 999 9 min 9999 min 99 h 59 min 99 99 h 999 9 h 9999 h Note The 99 99 s range is inhibited for the D1 and Di Cyclic modes Simultaneous and constant display of the current va...

Страница 32: ...ue readout 4 digits 5 Unit of time 6 Separation of units of time 7 Operating modes 8 Increasing Up or decreasing Down mode 9 Time range 10 Changeover relay status symbol NC Normally Closed NO Normally...

Страница 33: ...the next cycle if you are on the down count display Down c The unit is supplied with the following configuration 01 00 s d down C mode Prog ON d If inadvertently you enter the unit test procedure wit...

Страница 34: ......

Отзывы: