FINISH DRAIN INSTALLATION
Position EXTENSION ROD
(1)
onto POP-UP ROD
(2)
and tighten
THUMBSCREW
(3)
.
Position BIDET fixture and secure to floor.
Insert lift rod into lift rod guide.
Using metal TAILPIECE
(5)
, make connection to the TRAP
(6)
.
Remove one end of CLIP
(4)
from PIVOT ROD
(7)
by squeezing ends
together while sliding.
Insert PIVOT ROD
(7)
into second or third hole in EXTENSION ROD
(1)
and reassemble CLIP
(4)
. (EXTENSION ROD
(1)
may need to be bent.)
Adjust STOPPER height by repositioning EXTENSION ROD
(1)
on POP-UP
ROD
(2)
and tightening THUMBSCREW
(3)
.
3
1
1
7
4
6
5
2
INSTALL HANDLES
1
2
3
4
5
6
7
10
Figure B
Figure A
Figure D
Figure C
4
5
6
10
5
10
8
Turn VALVE to OFF position.
Figure A:
Install STEM ADAPTERS
(7)
onto VALVE STEMS
(8)
.
Figure B:
With colored side up, place FRICTION RING
(6)
over
DECK ADAPTER
(10)
. Loosely screw FRICTION NUT
(5)
onto
DECK ADAPTER
(10)
. Do not tighten. Align flats on FRICTION
NUT
(5)
with RIBS
(9)
in HANDLE BASE
(4)
.
Figure C:
Screw HANDLE BASE
(4)
with FRICTION NUT
(5)
onto DECK ADAPTER
(10)
until snug against mounting surface
and aligned properly.
Figure D:
Install LEVER HANDLE
(3)
onto HANDLE ADAPTER
(7)
and align. Check alignment, if not satisfactory remove and align.
Insert HANDLE SCREW
(2)
and tighten. Press in
INDEX BUTTON
(1)
.
9
4
FLATS
ALIGNED
. 3 & 7
INSTALL DIVERTER KNOB
B
12
15
14
13
11
Diverter Knob;
Push DIVERTER KNOB
(11)
onto HANDLE ADAPTER
(12)
. Push on RING
(13)
and tighten with SCREW
(14)
. Press on KNOB
CAP
(15)
. (The screwdriver Gap for
disassembling should face downwards).