LAVATORY FAUCETS
METAL POP-UP DRAIN
Installation
Instructions
7 8 5 1 7 R e v. 1 . 1
2385.000
2385.060
2385.400
2385.460
2385.500
2385.560
Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.
Certified to comply with ANSI A112.18.1M
U.S. PATENT NO. 4,294,289
1
P r i n t e d i n U . S . A .
Printed
on
Recycled
Paper
SUPPLY
NUT
HEX NUT
AERATOR
U- CHANNEL
POP-UP
ROD
PUTTY
PLATE
BOLT
FAUCET INSTALLATION
SINK
1/2 GPM
FLOW DEVICE
KEY
CARTRIDGE
SET
SCREW
INDEX
BUTTON
SET
SCREW
CAP
RETAINER
CAP
HANDLE
CARTRIDGE
SCREWS
HANDLE
BUSHING
HANDLE
BUSHING
LOOP
HANDLE
SEALS
CLIP
THUMBSCREW
STOPPER
DRAIN
FLANGE
GASKET
WASHER
NUT
DRAIN
BODY
EXTENSION
PIVOT
ROD
TAILPIECE
P0P-UP
ROD
UNDERBODY
SCREW
T M
SPACER
U- CHANNEL
HEX NUT
HOT LIMIT
STOP
PUTTY
PLATE
Put U-CHANNEL, SPACERS, if necessary and NUTS
onto BOLTS.
Place PUTTY PLATE on SINK. Push faucet supplies
and studs through deck holes.
Insert POP-UP ROD to assure proper clearance when
faucet is assembled to the sink.
Position FAUCET on SINK.
Tighten HEXNUTS.
Turn off water at
main supply.
CAUTION