Unit: mm
Rev. A0
- 1 -
- 4 -
Codie Concealed Mono Shower Mixing Valve
Dimension
Installation &
Operation Instructions
Pre-Installation Checks
* American Standard always keep raising and improving the product design and performance, and reserve the right to modify
the dimension and spefication. At this case, we will not inform you separately.
* This installation instruction sheet is for your reference only, the dimension and specification is subject to the actual products.
Thank you for selecting American-Standard - the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.
All instruction procedures must comply in strict accordance with applicable local plumbing and building codes
Recommended Tools and Materials
Pencil
Windtight Swathe
Adjustable Wrench
Level
Tape Measure
1
2
Test / Usage
Test
Usage
Trouble Shooting Guide
Care & Maintenance
FFASB236-709500BF0
ON
Conditions for usage
*Remove all impurity in pipes in order to avoid clogging before installation.
*Check installation dimensions in order to install it correctly.
* Recommended water pressure: 0.1~0.5Mpa.
* Environment Temperature:1~55℃
* Steam is not allowed.
During installation of the faucet, Please grab the body. Do not grab handle only.
Attention:
Please Leave the manual with the customer
after installation is finished.
Cartridge
Check cartridge packing.
Check any impurities.
Remove all impurities.
When packing is damaged, replace the cartridge.
Poor flow rate
Leakage
Spout or Shower
Trouble
Checkpoint
Contents
Action
Check water supply valve open position.
Open water supply valve to increase flowrate
Water Supply valve
* If you want to do the maintenance for the faucet, please follow the below process.
* Turn handle to “OFF”position. Open water supply valve to check all connections for leakage;
* Turn handle to“ON”position. Check the water flow .
1. Close the Water Supply System
1
2
4
3
5
6
7