background image

755438-100 Rev. B 4/18

2

1

Ensure that the floor and stud walls are square and plumb on a level 
floor as shown in Figure A. Provide a 6" x 6" (152 x 152mm) opening in 
the floor for the drain and refer to the product chart for actual drain 
location. The lower portion of the drain mount must fit into the 6"x 6" 
(152 x 152mm) opening. Check by dry fitting the shower base in the 
final location. Draw a line 3" (76mm) above the level subfloor on the 
wall studs at each side of the opening. 

FIGURE A

90°

90°

2" (51mm)

PVC Waste Pipe

6" x 6"

(152 x 152mm) 

Opening

C/L

(See Product Chart for Drain Location)

MARK STUDS 3" ABOVE LEVEL SUBFLOOR

NOTE: Shower pans are to be installed on sub-floors not finished floors. Shower 
pans will drain properly provided they are installed on a level surface.

Check the floor with a long level. A long level is more likely to detect level of 
sub-floor at its greatest dimensions. Check front-to-back at the left and right sides 
and at the center. Repeat for side-to-side dimensions. Finally check the diagonals. 
Depending on the results, some additional prep work may be necessary.

6036SMRHOL

6036SMLHOL

FRONT

TOP VIEW

60"

(1524mm)

4-9/16"

(116mm)

RIGHT SIDE

 2" 

(51mm)

1" 

(25mm)

2" (51mm)

THRESHOLD DEPTH

36"

(914mm)

17-3/4"

(451mm)

LEFT HAND

OUTLET

36"

(914mm)

4-9/16"

(116mm)

60"

(1524mm)

RIGHT SIDE

 2" 

(51mm)

1" 

(25mm)

2" (51mm)

THRESHOLD DEPTH

TOP VIEW

FRONT

17-3/4"

(451mm)

RIGHT HAND

OUTLET

4836SMCOL

FRONT

TOP VIEW

CENTER

OUTLET

48"

(1219mm)

24"

(610mm)

36"

(914mm)

17-3/4"

(451mm)

RIGHT SIDE

 2" 

(51mm)

1" 

(25mm)

2" (51mm)

THRESHOLD DEPTH

Отзывы: