B. THROUGH-THE-WALL INSTALLATION

NOTES: Chimney height should not exceed 30 feet for

through-the-wall installations (see Figure 26).
We recommend enclosure of exterior-
mounted chimneys below the roofline in
geographical areas experiencing sustained
low-ambient temperature to help reduce or
limit condensation, creosote build-up and
poor draft.  Also install an access door into
the enclosure for cleaning and maintenance.

1.

Make Opening In Wall

Be sure to maintain minimum of 2-inch airspace
clearance to combustibles.
a. Locate position on wall where chimney tee is to be

installed.

b. Cut a square opening through wall per Table 2.

2.

Install Wall Thimble
Cat. No. 6, 8 HS-WTP

a. Install the wall thimble through opening in wall with the

black painted surface on the inside wall (see Figure
22).  Screw each trim plate in place through the four
(4) prepunched holes on each trim plate (see Figure
23).  Use bead of high-temperature silicone sealant
between outer plate of thimble and exterior wall.

6

AmeriVent Model HS/HSS All-Fuel Chimney
Installation Instructions

2. Chimney Pipe Sections

Cat. No. 6, 8 HS/HSS-6, 12 18, 24 36, 48

See Section A.2., Page 2.

3. Chimney Cap, Storm Collar and Roof Flashing

See Section A.6., Page 4.

4. Chimney Connector Hook-Up

Connect the appliance to the chimney’s single-wall
adapter (see Figure 21) by using a minimum 24-gauge
single-wall connector pipe.  Clearances from connector
pipe to combustible material shall be as specified in
Chapter 5 of the National Fire Protection Association
(NFPA) Standard 211.

Содержание AMERIVENT HS

Страница 1: ...is galvanized steel This chimney is listed UL 103 TYPE HT for venting flue gases not exceeding 1000 F under continuous operating conditions In addition UL has conducted additional tests at 1400 F for...

Страница 2: ...ey installation requirements AmeriVent Model HS all fuel chimneys may be connected directly to a masonry fireplace by using an AmeriVent anchor plate instead of a standard support IMPROPER INSTALLATIO...

Страница 3: ...irestop must be installed on the top of joist in the same manner described in Section a 4 Attic Insulation Shield Cat No 6 8 HS AIS If the chimney passes through an attic space one of the following me...

Страница 4: ...upport Bracket Assembly see Figure 10 You may need to temporarily support the offset during assembly The offsets use the same locking system as the pipe sections described in Section A 2 Page 2 6 Chim...

Страница 5: ...ing is completed nail through all four sides of roof support into framework installed in Step b Use a minimum of sixteen 16 8d nails f Install the single wall adapter furnished with the support by pus...

Страница 6: ...o 6 8 HS WTP a Install the wall thimble through opening in wall with the black painted surface on the inside wall see Figure 22 Screw each trim plate in place through the four 4 prepunched holes on ea...

Страница 7: ...ssage of the chimney is obstructed it is necessary to cut a hole in the overhang Leave a minimum of 2 inch clearance and install the flashing and storm collar per Section A 6 a e Page 4 see Figure 14...

Страница 8: ...vapors which combine with expelled moisture to form creosote The creosote vapors condense in the relatively cool chimney flue of a slow burning fire As a result creosote residue accumulates on the flu...

Отзывы: