SPEEDDOME OPTIMA LT INDOOR CAMERA DOME
8200-0181-01, REV. E
INSTALLATION AND SERVICE GUIDE
6 of 14
Installation
Parts required
Note:
For installation to a tile ceiling, also order the
UL-approved RH2x2 Metal Plate Mounting Kit.
Install Kit 0352-0020-01
Connector, 3-position (power)
1
2109-0254-02
Connector, 2-position (data)
1
2109-0756-01
Wire, hanging
3.6m (12ft) 2898-0007-01
Card, quick connect
1
2402-2055-02
Template, cutout, hard mount
1
2402-2054-01
Procedure
Use the following steps when attaching the dome
to a hard ceiling.
1. Using template supplied, cut a hole in the
ceiling. Run power and data cables and the
video cable to the hole.
2. For ease of installation, adjust the two “swing
out” mounting clips for ceiling thickness.
3. To expose connectors and settings at the top
of the dome, remove the cover plate by
removing one screw and loosening the other.
Set the camera address.
As an example, address
107 is shown.
Address Switches
Terminated
Un-Terminated
Line
Termination
Switch
(S1)
S1
7
1
x100 x10 x1
SW3 SW2 SW1
P9
S2
SensorNet / Manchester:
Switch 6 & 7 "On", all others "Off"
8
On
Off
7 6 5 4 3 2 1
Comm. Select (S2)
AC
AC
1
1
SNet 1 - No Polarity
2 - No Polarity
Manch. 1 - WHT
2 - BLK
Comm. (P9)
Video
24Vac (P10)
RS422:
Switch 6 & 7 "Off", all others "On"
8
On
Off
7 6 5 4 3 2 1
RS422
1 - Rx +
2 - Rx –
4. Set address switches SW1, SW2, and SW3 for
the address (for example: 001–016 for VM16,
001–096 for VM96).
5. If daisy-chaining domes, the dome furthest
from the video controller requires that
termination switch S1 remain in the
“terminated” position (resistor symbol). All
other domes along the chain must be set to
“un-terminated”.
6. Inside the opening, check communications
DIP switch S2 for the correct settings.
•
For SensorNet and Manchester, ensure
switches 6 and 7 are “On”. Other switches
should be “Off”.
•
For RS-422, ensure that switches 6 and 7
are “Off”. Other switches should be “On”.
7. Determine if conduit or cables will be used. If
using conduit, remove the Romex clamp and
use 1/2in. flexible conduit and appropriate
fittings. If using cables, they must be plenum-
rated if running through a ceiling plenum and
they must be secured using the cover plate
and Romex clamp.
8. Leaving .6m (2ft) of service loop so the dome
can be dropped from the ceiling for servicing,
run the cable through the cover plate and
Romex clamp, if used.
9. Remove 2.5-3.8cm (1–1.5in) of jacket from the
cable end and install power and data
connectors supplied.
10. Plug connectors to the board according to the
figure above.
Mounting Clip