113344 - 9
www.amdry.com
25
5. Steam Damper Air Piston (Flow Control) Operation Adjustment
Although the damper operation was tested and adjusted prior to shipping at 80 psi (5.51 bar), steam damper
operation
must be
checked before the dryer is put into operation. Refer to
page 29
for instructions to
check steam damper operation. If damper air adjustment is necessary, locate flow control valve and make
necessary adjustments as noted below.
I. FIRE SUPPRESSION SYSTEM
BEFORE YOU START!
CHECK LOCAL CODES AND PERMITS
Call your local water company or the proper municipal authority for information regarding local codes.
IMPORTANT:
It is your responsibility to have
ALL
plumbing connections made by a qualified
professional to assure that the plumbing installation is adequate and conforms to local,
state, and federal regulations or codes.
IMPORTANT:
It is the installer’s or owner’s responsibility to see that the necessary or required
water, water pressure, pipe size, or connections are provided. Manufacturer assumes
no responsibility if the fire suppression system
is not
connected, installed, or
maintained properly.
Содержание ML-82 III
Страница 46: ...ADC Part No 113344 9 09 04 08 15 ...