21
Connect L1 and L2 to the power block and ground to the copper lug located in the rear service box
mentioned on the previous page.
If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/
pigtail (wire size
must conform
to rating of dryer), or the dryer can be hard wired directly to the
service breaker panel. In both cases, a strain relief
must be
installed where the wiring enters the
dryer.
b. 3-Phase (3ø) Wiring Connections (Hookup) - For Non-Reversing Models Only
The electrical connections on
ALL
3-phase (3ø) gas model dryers are made into the rear service box
located at the upper left area of the dryer.
NOTE: A CIRCUIT SERVICING EACH DRYER
MUST BE
PROVIDED.
If local codes permit, power to a gas dryer can be made by the use of a flexible U.L. listed power cord/
pigtail (wire size
must conform
to rating of dryer), or the dryer can be hard wired directly to the service
breaker panel. In
ALL
cases, a strain relief
must be
installed where the wiring enters the dryer.
S
INGLE
-P
HASE
(1
Ø
)
E
LECTRICAL
C
ONNECTIONS
L
EADS
Black
+
Positive
White
-
Neutral
Green
Ground
or
L2