B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws (bearing set screws), nonpermanent gas connections (i.e., unions, shut-off valves,
orifices), and grounding connections. Fan (impellor) V-belts, along with the drive motor V-belts
should be
examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of
controls and valves. Complete operational check of
ALL
safety devices (i.e., door switches, lint drawer switch,
sail switch, burner and hi-limit thermostats).
30 DAYS AFTER INSTALLATION
SHUT OFF ALL POWER TO THE DRYER.
Verify that the electrical connections to the motor contactors
and overloads are tight. This is done to accommodate the compression of the wires over time.
C. LUBRICATION
MONTHLY
The two (2) 1-3/4-inch (4.45 cm) bearings that support the impellor/fan shaft
should be
lubricated. Use Shell
Alvania #3 grease or its equivalent. Impellor/fan shaft bearings
must be
lubricated.
EVERY 3 MONTHS
The four (4) 2-inch (5.08 cm) bearings that support the drive and idler shaft
should be
lubricated. Use Shell
Alvania #3 grease or its equivalent. Drive and Idler shaft bearings
must be
lubricated. The motor bearings,
idler bearings...and under normal/most conditions the tumbler bearing are required to be lubricated.
Содержание ML-410
Страница 7: ...3 ML 410 Reference Guide ...
Страница 8: ...4 ...
Страница 28: ...24 MLG 410 1 Door Forward Tilt with Sprinkler ...
Страница 31: ...27 MLS 410 2 Door 2 Way Tilt ...
Страница 67: ...ADC 113128 1 03 13 00 25 ...