17
3. Piping /Connections
ALL
components/materials
must conform
to National Fuel Gas Code Specifications ANSI Z223.1-LATEST
EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid
Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local
codes and ordinances and
must be
done by a qualified professional. It is important that gas pressure
regulators meet applicable pressure requirements, and that gas meters be rated for the total amount of
ALL
the appliance BTUs being supplied.
The dryer is provided with a 2” N.P.T. inlet pipe connection located at the right side of the base of the
dryer. For ease in servicing, the gas supply line of each dryer must have its own shutoff valve.
The size of the main gas supply line (header) will vary depending on the distance this line travels from the
gas meter or, in the case of L.P. gas, the supply tank, other gas operated appliances on the same line, etc.
Specific information regarding supply line size
should be
determined by the gas supplier.
NOTE:
Undersized gas supply piping can create a low or inconsistent pressure, which will result
in erratic operation of the burner ignition system.
Содержание AD-670 Phase 7
Страница 16: ...12 ...
Страница 44: ...40 B I O BOARD INPUT AND OUTPUT L E D INDICATORS ...
Страница 59: ...55 ...
Страница 60: ...ADC113049 5 09 03 04 0 ...