![American Dryer Corp. AD-670 Phase 7 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/american-dryer-corp/ad-670-phase-7/ad-670-phase-7_installation-manual_2923420020.webp)
16
2. Technical Gas Data
a. Gas Specifications
* Measured at the gas valve pressure tap when the gas valve is on.
b. Gas Connections
Run a 2-inch gas pipe from the main gas header to the dryer. There is a 2-inch gas pipe connection at
the bottom of the dryer base.
Inlet Connection ................... 2” F.P.T.
BTU/hr input (per dryer) ...... 2,200,000 BTU/hr (554,400 kcal/hr)
TYPE OF GAS
Natural
Liquid Propane
Pressure @ Hi-Fire Gas Valve*
3.5 inches W.C.
8.7 mb
6.5 inches W.C.
16.17 mb
Pressure @ Gauge P1*
3.5 inches W.C.
8.7 mb
6.5 inches W.C.
16.17 mb
Pressure Into Internal Regulator
6.0 - 12.0 inches W.C.
14.92 mb - 29.9 mb
11.0 inches W.C.
27.4 mb
Shaded areas are stated in metric equivalents
Содержание AD-670 Phase 7
Страница 16: ...12 ...
Страница 44: ...40 B I O BOARD INPUT AND OUTPUT L E D INDICATORS ...
Страница 59: ...55 ...
Страница 60: ...ADC113049 5 09 03 04 0 ...