14
C. DRYER ENCLOSURE REQUIREMENTS
It is recommended that the rear of the dryer be positioned approximately 3 feet (0.91 meters) from the nearest
obstruction (i.e., wall) for ease of installation, maintenance, and service. Bulkheads and partitions
should be
made of noncombustible materials. The bulkhead facing
must not be
closed in
ALL
the way to the top of the
dryer. A 2-inch (5.08 cm) clearance is required.
NOTE:
Bulkhead facing
should not be
installed until after dryer is in place. Ceiling area
must be
located a minimum of 12-inches (30.48 cm) above the top of the dryer.
IMPORTANT:
Even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72
cm) or more is suggested for steam dryers and especially in cases where sprinkler
heads are over the dryers.
NOTE:
When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm)
above the dryer console (module) is suggested. Dryers may be positioned sidewall to
sidewall, however, 1 or 2-inches (2.54 or 5.08 cm) is suggested between dryers (or wall) for
ease of installation and maintenance. Allowances
must be
made for the opening and closing of
the control and lint doors.