
11
CAUTION:
This dryer produces combustible lint and
must be
exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint build up.
IMPORTANT: Dryer must be installed in a location/environment, which the ambient
temperature remains between 40º F (4.44º C) and 130º F (54.44º C).
B. UNPACKING AND SETTING UP
Remove protective shipping material (i.e., plastic wrap and optional shipping box) from dryer.
IMPORTANT:
Dryer
must be
transported and handled in an upright position at
ALL
times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid the
dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
located at the rear base (remove the back panel for access), and two (2) are located in the bottom of the lint
chamber. To remove the two (2) lag bolts located in the lint chamber area, remove the lint drawer and the two (2)
Phillips head screws securing the lint door in place.
NOTE:
Lint door
cannot
be removed totally from dryer due to a safety chain. The chain is secured to
the dryer and door with special tamperproof screws. The safety chain
must not be
removed
or cut from the lint door. Once these lag bolts are off, remove the eight (8) nuts and bolts
holding the skid together and take the skid apart. The dryer can now be removed from the
skid and set into place.
1. Leveling Dryer
a. To level dryer, place 4-inch (10.16 cm) square metal shims (refer to the
illustration above
) or other
suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear.
Содержание AD-115ES II
Страница 25: ...21 ...