2 INSTALLATION
2.1 General
This section describes on-site PASO-350 installation and cable connections. PC or laptop is required for
configuration and future maintenance if necessary.
2.2 Installation Requirement Overview
Ensure that deployment site is well suited:
Ensure the environment is suitable for the installation and operation.
Site has lightning rod installed with proper grounding to avoid lightning strikes.
Site has a basic ventilated environment.
If necessary install cable ladders at the site when needed.
Standard 19-inch rack is installed for the repeater.
Site electrical installation is well completed and inspected.
Power source is installed and tested for +24V DC and/or 100~240 VAC.
The rack and the repeater are both grounded to minimize risks of lighting damages or accidents.
VHF and GPS Antenna systems are installed and tested. Both cables are equipped with gas-tube or
arrestor to avoid lightning strikes.
Cabling and sensors for external alarms are installed.
2.2.1 Installation Material
This section contains lists of hardware, tools and requirements for installation.
2.2.1.1 Items in the Package
PASO-350 package comes with the following items. If any item is missing, notify AMEC or your local dealer
immediately.
PASO-350 main unit
Power cable for 100~240V AC (1.8m)
One LCT Cable (1.2m)
CD-ROM with AMEC AIS Repeater Manager and the digital copy of this user manual
Frame grounding cable (1.5m; AWG#12)
M5 screws x 4