5. Electrical connectors
Figure 5-1// Connectors description
Figure 5-2 // 4..20 mA current loop connection
6. Starting up
After connecting the power, the AVM 1002DX module enters into testing procedure. Subsequently all
display’s segments and LEDs will flash for a short period of time. If everything is operating properly,
then green OK LED is pulsing with a frequency of approximately 1 Hz. Once the testing procedure is
over, the device is ready to operate. If an error of a sensor circuit is detected, then corresponding LED
will lit.
6
AV MONITOR 1002DX