11
Electrode assembly
Figure 27
Remove the two screws securing the
electrode assembly. Disconnect the
leads, and remove. Check for cracked or
damaged ceramics. Clean or replace as
necessary. Re-fit components in reverse
order of removal. On service or
replacement of the electrode assembly,
check the spark electrode gap is 3.5mm
+ or - 0.5mm.
Burner head
Figure 28
Remove three screws. Clean or replace
as necessary.
Gas valve
Follow instructions for replacement of
burner head and injector then proceed
as follows:
Figure 29
Figure 30
Disconnect gas fittings, disconnect
wiring harness from valve. Remove
rear panel of burner box. Remove the
two screws securing the gas valve to
the panel and two screws securing the
valve to burner box. Withdraw gas
valve. Remove injector carrier. Replace
gas valve. Re-fit components in reverse
order of removal. For correct
operation follow instructions for
commissioning of heater.
Electronic sequence controller
Figure 31
Disconnect the electrical connector
from the controller to the wiring
harness and the ignition high tension
lead.
Remove the two screws and replace the
controller.
Re-fit in reverse order of removal
ensuring electrical connections are
made.
Содержание VISION COMPACT VC40
Страница 1: ...Operation maintenance and servicing manual VC40 GAS FIRED RADIANT TUBE HEATERS VISION COMPACT ...
Страница 18: ......
Страница 19: ......