![Amatis Sigma Luminous Border Router SL-AMBR Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/amatis/sigma-luminous-border-router-sl-ambr/sigma-luminous-border-router-sl-ambr_user-manual_2918835006.webp)
v5.2
page 6
When Border Router is connected to power, all lights turn on, then turn off, then turn back on one-
by-one. Indicators can be diagnosed with this table:
Border Router can integrate with building management systems usinga BACnet/IP connection over
ethernet/RJ45 to each Border Router on-site. We recommend the following:
1. Configure control scenes that you wish to trigger from BACnet using our interface.
2. These control scenes provide a standard writable point on Border Router, where you can “call”
the scenes created in our system.
Examples include:
• Turn lights on in the evening to a dim, constant output (set light output to 30% and disable
vacancy control)
• Turn lights on in the morning to normal operation during the day (set light output to default
and enable occupancy control)
• All lights on full override
• All lights off override
• And any other custom scenes you wish to have control of via your BAS
As for schedules, we can trigger schedules either within our own system, or via your BACnet
system.
Light reference indicator table
LED
Flashing
Solid
Off
Green
Processor boot-up
SUCCESS
Processor boot-up
SUCCESS
Processor
ERROR
Orange
Off Line data logging
SUCCESS
Off Line logging
ERROR
Blue
Data logging and configuration enabled
SUCCESS
Data logging enabled
SUCCESS
Internet connection Error
ERROR
White
Normal Operation
Red
Power connection
SUCCESS
Power connection
ERROR
Note: this table is only valid after Border Router has completed its startup sequence and the green LED is solid.
BACNet/IP integration