5
Quick Reference Specifications..........................................6
Safety Precautions..............................................................7
Refueling and Storage of Fuel Cylinders............................9
Operator Responsibility.......................................................9
Canadian Safety Requirements........................................10
Test for Operator-Ear Sound Pressure Level.................11
Test for Hand Arm Vibration..............................................11
Machine Preparation.........................................................12
Unpacking the Machine...........................................12
Filling the LP Cylinder...............................................12
Installing the LP Cylinder...........................................12
Machine Components.......................................................13
Controls and Instruments.........................................13
Engine Ignition Switch..............................................14
Hour Meter/Tachometer............................................14
Bail Throttle...............................................................14
Fuse....................................................................14
SafeSense Emissions Monitoring............................15
Rok-Bak & Pad Change............................................16
SafeStop (optional)...............................................16
Pad / Brush Change..................................................17
Handle Adjustment...................................................17
Transport Cart..........................................................18
How the Machine Works...................................................18
Pre-Operation Checklist....................................................18
LP Fuel Cylinder................................................................19
Installing the LP Fuel Cylinder..........................................19
Starting the Machine........................................................20
Idling and Stopping the Machine.....................................20
Stripping..........................................................................20
Machine Troubleshooting..................................................21
Maintenance...............................................................22
Scheduled Maintenance Chart................................22
Oil Level Inspection..................................................23
Oil Change................................................................23
Oil Filter Replacement.............................................24
Spark Plug Inspection and Replacement.................24
Hood Removal..........................................................24
Air Filter Inspection and Replacement....................24
Engine Dust Filter......................................................25
Valve Clearance & Re-torque Heads........................25
Valve Seating............................................................25
Head Bolt Maintenance............................................25
Cooling Fin Maintenance..........................................25
Inspect Fuel Hose and Connections.........................25
Inspect Brushes and Pad Holders..........................25
Belt Maintenance......................................................26
Belt Replacement.....................................................26
Gearbox Maintenance..............................................26
Tire Maintenance......................................................26
Battery Maintenance.................................................27
Machine Storage......................................................27
Repacking the Machine............................................27
Transporting the Machine.........................................27
Machine Specifications.....................................................28
Parts Manual.....................................................................29
Electrical Schematic (with SafeSense)....................30
Electrical Schematic (without SafeSense)...............31
Connections (with SafeSense).................................32
Connections (without SafeSense)............................34
Engine Assembly......................................................36
Frame Assembly.......................................................38
Bulkhead Assembly..................................................40
Main Assembly.........................................................42
Main Assembly (Deck)............................................44
Regulator, Handle, & Hood Assembly.....................46
Transport Cart Assembly.........................................48
Small Off Road Engine Certification Warranty.................51
Manufacturer’s Warranty...................................................52
Safety Awareness Form.....................................................53
Table of Contents
Содержание Pioneer Eclipse PE440ST
Страница 1: ...Propane Stripping Machine PE440ST Operator s Manual...
Страница 2: ......
Страница 30: ...30 Electrical Schematic with SafeSense...
Страница 31: ...31 Electrical Schematic with Optional SafeStop...
Страница 32: ...32 Electrical Schematic without SafeSense...
Страница 33: ...33...
Страница 34: ...34 Connections with SafeSense...
Страница 36: ...36 Connections with SafeStop...
Страница 37: ...37 Connections with SafeStop continued...
Страница 38: ...38 Connections without SafeSense...
Страница 42: ...42 Frame Assembly RF037700 050112 4 3 11 9 10 6 8 7 5 14 12 13 2 1 19 22 2 21 17 2 18 16 15 9 10 20 23 25 24...
Страница 52: ...52 Transport Cart Assembly RF037800 052311 6 5 3 2 4 4 7 1...
Страница 54: ......
Страница 58: ......
Страница 59: ......