
2110A PT Peanut Combine
Operation
Daily Pre-Start Checks
11. Remove walker cylinder inspection cover
(photo) and inspect for damage or foreign
material. Pay particular attention for
excessive wear or damage to the walker
cylinder bar bushings, cam mechanisms,
and cam follower bearings.
12. Remove the lower separator inspection
covers below the disc separator and
check the stemmer and collection auger
for obstructions. Also check for trash
build-up under the first disc separator
shaft.
13. Check to make sure the area between the
collection auger housing and stemmer
support hinge is clear of dirt and debris.
Also, check to make sure no buildup has
accumulated under the first disc separator
shaft or behind the side panels and disc
separator bearings.
14. Check all belts and chain drives for proper
alignment, tension, and wear.
15. Check the hydraulic system for leaks and
adequate fluid.
16. Check the cleaning fan for obstruction in
intake or damaged blades.
17. Replace all covers and shields, and
remove the bin safety strut. Lower the
bin.
18. Check tire pressures and lug nut torques
according to specifications.
19. Continue with the operating procedure
when:
•
The combine is attached to a tractor.
•
All of the daily pre-start checks have
been performed.
•
Operating procedures are clearly
understood by all operators.
20. Start the tractor and leave it in PARK.
21. With the engine at idle, engage the PTO.
Listen for any noise which could indicate
a problem, such as a damaged or
defective bearing.
Walker cylinder
inspection cover
Collection auger
Lower
separator
inspection
cover
CAUTION
Failure to remove the safety strut before
lowering the bin can severely damage the
bin.
CAUTION
Make sure the lug nut torque and cold
inflation tire pressure are at the required
specifications. Improperly tightened lug
nuts or incorrectly inflated tires can result
in serious personal injury.
MAN143
12/18/15
31
Содержание 2110A
Страница 2: ......
Страница 4: ......
Страница 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Страница 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Страница 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Страница 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Страница 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Страница 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Страница 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Страница 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...