
Preparation
2110A PT Peanut Combine
Overview
Before operating the machine for the first
time, go over the section titled “Pre-Delivery
Checks” with your dealer to verify the
combine is ready for operation. Every
combine is test run at the AMADAS plant, but
a thorough pre-delivery inspection is
important, as items may have loosened
during shipping.
Chapter 3,
Operation
, contains a “Daily
Checklist.” It is important that you perform
these checks each day you intend to use your
combine. These checks are intended to help
you detect problems early, reduce downtime,
and extend the life of your combine.
Safety Strut
Read Chapter 1,
Safety
, before performing
any checks on your machine. In addition, be
aware of the safety strut that locks the bin in
the open position.
Always
use the safety
strut as intended before checking or working
around the open bin. The safety decal
located below the strut provides instructions
for using the strut.
Safety Strut
18
2/29/16
MAN143
Содержание 2110A
Страница 2: ......
Страница 4: ......
Страница 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Страница 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Страница 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Страница 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Страница 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Страница 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Страница 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Страница 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...