
CHAPTER 2: GETTING STARTED
UB25 LINEAR DC RESISTANCE WELDING CONTROL
990-665
2-5
Voltage Sensing Cable Installation
8
Using a cable tie as a strain relieve, attach each voltage sensing lead to its corresponding electrode
holder so that the lead terminals will not break away under heavy production operating
conditions.
9
Connect the Firing Switch cable connector from the Power Supply to the firing switch cable
connector from the weld head.
Содержание UB25
Страница 1: ...990 665 REV J LINEAR DC RESISTANCE WELDING CONTROL UB25 OPERATION MANUAL...
Страница 86: ......
Страница 98: ......
Страница 102: ......
Страница 132: ......
Страница 144: ......
Страница 148: ...AMADA WELD TECH INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...