
UB25 LINEAR DC RESISTANCE WELDING CONTROL
990-665
F-1
APPENDIX F
RELAY TIMING DIAGRAMS
Introduction
Instructions for relay setup are in
Chapter 5, Section VI, Relay Settings.
Instructions cover the
ON/OFF
state, the
SET RELAY TO
and the
WHEN
states:
•
WELD
•
END OF WELD
•
ALARM
•
OUT OF LIMITS
−
P1 HIGH LIMIT
−
P1 LOW LIMIT
−
P2 HIGH LIMIT
−
P2 LOW LIMIT
The following diagrams show the timing sequence for each relay
WHEN
state.
WELD
When welding, the relay output signal will start within 5 milliseconds after the start of
SQUEEZE
and
will stay energized for 0-150 milliseconds after the end of the
HOLD
period.
Содержание UB25
Страница 1: ...990 665 REV J LINEAR DC RESISTANCE WELDING CONTROL UB25 OPERATION MANUAL...
Страница 86: ......
Страница 98: ......
Страница 102: ......
Страница 132: ......
Страница 144: ......
Страница 148: ...AMADA WELD TECH INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...