Supervisor 3500 Installation Instructions
PUD3673R1-1
For assistance: [email protected] +1 (909) 591-8431
Page 9
Electrical Requirements
Conduit Requirements
Power Supply
110-120 VAC, 60 Hz or 220/240 VAC, 50 Hz
Power Requirements
Peak power consumption is 300W per lane with all options installed
Operational Voltage
Primary power is stepped down and rectified for low-voltage 24 VDC, 12 VDC,
and 5 VDC operation
Fuse
2.5A (slo-blo) located in the master cabinet
Drive Motor
24 VDC (brushless)
Surge Protection
Alvarado suggests the use of surge protection on the high-voltage power line to
further protect electronics
Fig. 5
SU3500 Conduit Lines
Seal the floor area around the conduits running up and
into the cabinets. This will prevent condensation and
debris build-up coming from whatever may be below the
floor.
NOTE
Symbology
Description
Conduit Size
Primary
Power**
3/4”
Access Control /
Ethernet
3/4”
Access
Control
3/4”
Crossover
Cable
1.5”
**If the External DC Power Supply option was ordered,
use this conduit to route 24VDC.
The two conduit openings at the ends of each cabinet are
9" x 2.80” (229mm x 71mm). Install the three required
conduits in these areas [Figure 5].
NOTE
For multi-lane conduit requirements, refer to
Appendix B on Page 33.
NOTE