background image

2

We reserve the right to any technical change. 

Valid on 2022.04.04

OPERATING MANUAL FOR UNDER PLASTER SWITCH WITH RADIO RECEIVER DC 318

3. REMOTE CONTROLLERS

LEGEND
UP 

activation of this button will move curtain up.

DOWN 

- activation of this button will move curtain down.

P2 

- activation of this button will switch to programming mode.

K+

  

- activation of this button will switch to the next channel.

K-

  

- activation of this button will switch to the previous channel.

K2 

- second channel buttons.

K1 

- first channel buttons.

MODE 

- button activates the settings of the clock and date.

Activation of the “P2” button in remote controller DC1670, DC1671, DC315, DC2291 is performed by a combination of both 
keys “STOP” and “UP”.

DC 305 DC 306 DC 313 DC 920

P2

P2

K-

UP

STOP

K+

DOWN

UP

STOP

DOWN

MODE

P2 OK

MODE

P2 OK

UP

STOP

DOWN

P2

UP

STOP

DOWN

UP

STOP

DOWN

UP

STOP

DOWN

K1

K2

UP

STOP

DOWN

MODE

K-

K+

K+

P2

K-

UP

STOP

DOWN

UP

STOP

K+

K-

DOWN

P2

Activation of the “P2” button in DC1675, DC1676 wall transmitters is 
performed by a combination of both keys “MODE” and “K+”.

UP

STOP

KEY LOCK

DOWN

DC 287

DC 289

DC 288

DC 448

DC 661

DC 229

DC 315

DC 1670

DC 1671

DC 1675

DC 1676

DC 1673

DC 1600

DC 1602

DC 2291

Содержание DC 318

Страница 1: ...d equipment to a designated collection point for proper processing The marking means at the same time that the equipment was put on the market after 13 August 2005 These legal obligations have been introduced to reduce the amount of waste generated from waste electrical and electronic equipment and to ensure an appropriate level of collection recovery and recycling The equipment does not contain a...

Страница 2: ...ons K1 first channel buttons MODE button activates the settings of the clock and date Activation of the P2 button in remote controller DC1670 DC1671 DC315 DC2291 is performed by a combination of both keys STOP and UP DC 305 DC 306 DC 313 DC 920 P2 P2 K UP STOP K DOWN UP STOP DOWN MODE P2 OK MODE P2 OK UP STOP DOWN P2 UP STOP DOWN UP STOP DOWN UP STOP DOWN K1 K2 UP STOP DOWN MODE K K K P2 K UP STOP...

Страница 3: ...nsmitter Indicator light flashes 3 times The transmitter has been added Press and hold simultaneously UP and DOWN buttons with power supply on The indicator light is on 5 ERASING ONE TRANSMITTER Press and hold simultaneously UP and DOWN buttons with power supply on The indicator light is on After 3 seconds when the indicator light turns off release the Press STOP button The indicator light turns o...

Страница 4: ...ep control of venetian blind 6 CHANGING THE OPERATING MODE PULSED CONTINUOUS 7 RESTORE FACTORY SETTINGS Press and hold simultaneously STOP and DOWN buttons with power supply on The indicator light is on After 6 seconds indicator light flashes 3 times Factory settings restored Headquarters Production plant in Bielsko Biała Production Plant in Opole Warszawska 153 43 300 Bielsko Biała Poland ul Gosł...

Отзывы: