Page 6 of 8
7
Place the two Bottom Seals [
P
] over the bottom of both door
panels. One seal needs to be positioned with the sweep leg is
on the same side as the roller. The other seal should be installed
with the sweep leg on the side with the cap cover.
8
Push the stoppers to the outside of the bar, on both ends. You
will need to hang the interior door panel first. It is the panel
that, when held, has the rollers near you and the sweep leg of the
bottom seal on the opposite side. Lift the rollers above the bar and
making sure that the bottom engages the center guide, lower the
interior panel onto the header bar. Repeat for the exterior panel.
9
Install the 4 lower roller assemblies at this point. Before fully
tightening the roller screws, rotate the cap to raise the roller until
it contacts the bottom of the bar. Using an allen wrench in the hole
on the edge of the roller cap may help.