background image

 

T1RM3F4(D)V 

- 3 - 

Assembling and Attaching Z Bracket Wire Management Accessory 

(included)

:

Altronix Trove Rack enclosures include Z Bracket, a convenient and reliable wire management accessory. 

1.  Carefully unpack Z Bracket. Do not discard hardware (included) 

(Fig. 1, pg. 3)

.

2.  Attach arms to each other using bolts and lock nuts 

(Fig. 1a, pg. 3)

.

3.  Attach the hinge brackets to the ends of arms using bolts and nuts positioning them as shown on 

Fig. 1b, pg. 3

.

4.  Make sure that all nuts are tightened.

5.  Attach the hinge bracket on the longer side of Z Bracket to the adjustable rail using bolts and lock nuts (included) 

(Fig. 2, 2a, pg. 3)

.

6.  Attach the hinge bracket on the shorter side of Z Bracket to the rear of the rack enclosure using bolts (included).

Fig. 2

Fig. 2a

 Hardware 

(included)

:

  

Ten (10) bolts and 

eight (8) lock nuts

Two (2)

Fig. 1

Fig. 1b

Fig. 1a

Содержание TROVE T1RM3F4V

Страница 1: ...ck enclosure with Altronix and Mercury LenelS2 backplane TM1R 1 eFlow6NBV Power Supply Charger 1 VR6 Voltage Regulator 1 PDS8CB PTC Dual Output Power Distribution Module 1 ACM4CB PTC Access Power Controller Access Power Integration Rev T1RM3F4V080720 Installing Company __________________________ Service Rep Name ___________________________________________ Address __________________________________...

Страница 2: ...t PTC Rating Fail Safe Fail Secure or Dry Form C Outputs ACM4 Only PDS8 Board Input Fuse Rating PDS8 Board Output Fuse Rating PDS8CB Board Input PTC Rating PDS8 Board Output Fuse Rating DC Aux 24VDC Output Range V 24VDC Output Range V T1RM3F4V 2 5 5A 250V 10A 32V 20 28 26 4 20 28 26 4 24VDC 5 6A 2 5 10A 250V 3A 32V 4 10A 32V 3A 32V T1RM3F4DV 2 0 2 5A 9A 2 5A Hardware and Accessories Specifications...

Страница 3: ...k nuts Fig 1a pg 3 3 Attach the hinge brackets to the ends of arms using bolts and nuts positioning them as shown on Fig 1b pg 3 4 Make sure that all nuts are tightened 5 Attach the hinge bracket on the longer side of Z Bracket to the adjustable rail using bolts and lock nuts included Fig 2 2a pg 3 6 Attach the hinge bracket on the shorter side of Z Bracket to the rear of the rack enclosure using ...

Страница 4: ...nd spaded connectors inside the drawer Connect tamper switch wiring to the Access Control Panel input or the appropriate UL Listed reporting device To activate alarm signal open the rack drawer 3 Slide the rack enclosure into an open 2U location in the four post rack cabinet 4 Utilizing proper fasteners attach front ears to the rack rails 5 Attach the rear of the adjustable slides to the rear rail...

Страница 5: ...ERVISED BAT DC NC C NO AC FAIL NC C NO BAT FAIL AUX NO GND RESET VR6 is mounted under PDS8 CB A C D D C B B A To IEC connector To LED lense T1RM3F4 D V Configuration of Mercury Boards 1 Fasten spacers onto metal pems configuration A B C or D of backplane depending on the access controller Fig 5 pg 5 2 Position access controller module over corresponding spacers and fasten screws into spacers Fig 5...

Страница 6: ... 6 T1RM3F4 D V Notes ...

Страница 7: ...T1RM3F4 D V 7 Notes ...

Страница 8: ... 1mm 11 175 283 8mm 2 4 61mm 4 57 116 1mm 3 25 82 3mm 26 5 673 1mm 19 482 6mm R 1 27 32 3mm 1 25 4mm 0 55 14mm 3 62 92mm Altronix is not responsible for any typographical errors 140 58th Street Brooklyn New York 11220 USA phone 718 567 8181 fax 718 567 9056 web site www altronix com e mail info altronix com Made in U S A IIT1RM3F4 D V G14U MEMBER ...

Отзывы: