
6600/Rev/Mar.2021
Page 11
Altronic Research Inc.
SECTION II
TEST EQUIPMENT AND SPECIAL TOOLS
2-1. Test Equipment Required.
No test equipment is required for routine maintenance. In
some circumstances it may be desirable to determine the temperature differential (outlet air
minus inlet air) and ambient air temperature which the equipment is experiencing. We
recommend the John B. Fluke Mfg. Co. Model 52 or equivalent instrument for this
function.
2-2. Special Tools Required.
Although no non-standard tools are required for routine
maintenance, we recommend the technician have the following specialized tools available:
1 Torx T-20 driver
1 Tee handle hex key, 3/16" bit
1 Power screwdriver with 3/16" hex key & torx T-20 bit
SECTION III
PREPARATION FOR USE AND RESHIPMENT
3-1. Unpacking Equipment.
The units should be handled and unpacked with care. Inspect
outer cartons for evidence of damage during shipment.
Claims for damage in shipment
must be filed promptly with the transportation company involved
. No internal packaging or
bracing is used for shipments and the units should not rattle when being unpacked.
3-2. Pre-installation Inspection.
Conduct a thorough inspection of the units, paying particular
attention to the following items:
a. Screws in place and tight.
b. All panels and grills free of dents and scratches.
c. RF connector visually OK.
d. Twistlock Amphenol connector OK.
While inspecting RF connector, measure DC resistance of the unit by reading from the
center conductor to the outer conductor. Compare this reading to that on the specification
sheet at the end of this manual. Reading should be
±
1 ohm. If not, consult factory.
Содержание OMEGALINE 6600 Series
Страница 18: ...6600 Rev Mar 2021 Page 18 Altronic Research Inc SECTION VI 6 1 OUTLINE AND DIMENSIONS...
Страница 19: ...6600 Rev Mar 2021 Page 19 Altronic Research Inc...
Страница 20: ...6600 Rev Mar 2021 Page 20 Altronic Research Inc...
Страница 21: ...6600 Rev Mar 2021 Page 21 Altronic Research Inc...