
22
Assembly for 1450 Towers
Assembly Procedure - Mobile Towers 1450 3T Method
5.
Fit a temporary deck on the lowest rungs. Fit
a trapdoor deck on the 8th rung (2.0m) on
one side of the tower. Ensure that the trap-
door is positioned with the hinges towards
the outside of the tower as shown. Climb the
end frame below the trapdoor on the inside
of the tower, and from within the protected
trapdoor position, fit horizontal braces on
the 10th and 12th rungs (in that order) on
both sides of the deck.
Do not climb onto the deck until it is fully
guardrailed.
When horizontal braces are fitted as guard
-
rails, they should be 0.5m and 1.0m (2 and 4
rungs) above the deck level. Remove the
temporary deck from the lowest rung.
Fit Stabilisers
Содержание BOSS CLIMA TOWER 1450
Страница 1: ...LIGHT ACCESS BOSS CLIMA TOWER User Guide LW LH 10 21 ...
Страница 9: ...8 sales altradgeneration com Safety First ...
Страница 35: ...34 sales altradgeneration com Notes ...