background image

10

Blade Adjustment

GB

Transportation

GB

The blade pitch control knob is at easy reach of the operator. The pitch adjustment has an unlimited pitch variation and this can 
be undertaken whenever necessary. During 

¿

 nishing setting up/hardening may vary from area to area across the 

À

 oor, so the pitch 

adjustment can be changed to suit accordingly while the machine is in operation. When transporting the trowel on a truck, always 
keep blades fully horizontal 

À

 at on the 

À

 oating disc. 

For transportation of the machine use lifting eye. Alternatively to lift the machine, use an aid equipment through the stationary ring, which 
can carry the weight of the machine ,with a carrying pipe on the back past of handle. 

Troubleshooting Guide

GB

Servicing

GB

Gearbox

Check oil level every month. On side of the gearbox there is an plug. Use “SHELL OMALA 220  (750ml)” gear oil or equivalent.

Machine Cleaning

Clean the machine after it has been used to prevent the collection of hardened cement. Hard concrete/cement paste is very dif

¿

 cult 

to remove. To clean it use an old brush or hand brush. 

Changing of Blades

Be careful when changing old blades with new. Due to the way the blades wear, the old blades become very sharp, like a knife 
blade. As a safety precaution very heavy-duty gloves during this operation to prevent the hands being cut. Remove bolts and lock 
washers on each trowel arm and remove the blades. Before installing new blades clean all concrete/cement from bottom and side 
of the trowel, be sure trowelling edge of the blade is behind trowel arm. Install bolts and lock washers on each trowel arm and 
fasten securely.

Tightening the V-Belts

If you notice a loose on V belt, check the tightness. Especially in 

¿

 rst using and V belt change. Check the V belt tightness after 8 

hours later. Using your head 

¿

 nger push the V belt from its middle point. It must stretch about 2cm.If it stretches more, it is loose.

For tightening; loose the motor 

¿

 xing screws.(till motor moves away on the table) Loose the motor lock nut. Loose the screws, push 

the motor backward. Checking the V belt tightness, do the same operations. Until tightness of V belt is desired value, screw the 
motor luck nut, and then screw the motor 

¿

 xing screws.

Problem Cause 

 

Remedy

Engine will not start.  

No fuel getting to engine. 

Open fuel tap. 

 

 

Fill fuel tank. 

 

Engine switched off. 

Switch engine on. 

 

Spark plug fouled. 

Clean, check and reset plug gap.

 

Engine cold. 

Close choke. 

 Engine 

À

 ooded. 

Open choke, fully open throttle, pull recoil starter until engine 

¿

 res.

 

Cutout switch wire  

Reconnect disconnected wire.

Leaving Swirls in  

Main Shaft damaged. 

Check and replace as necessary.    

 

 

 

concrete, Rolling  

Spider Plate arms bent. 

Replace as necessary. 

 

 

 

 

 

Concrete or Bouncing. 

Blades are unevenly adjusted. 

Check and adjust as necessary. 

 

 

 

 

 

Blades are all different sizes. 

Replace, ensuring all blades are the same size. 

 

 

 

Blades are worn. 

Replace blades.

Содержание BELLE PR0 600X

Страница 1: ...0 20001 3 09 17 Operators Manual Operators Manual Manuel De L Op rateur Manual del Operador Manual de Opera o Handleiding Betjeningsvejledning Bedienungshandbuch Manuale Dell Operatore Bruksanvisning...

Страница 2: ...ertificado foi adquirido a um distribuidor autorizado do Belle Group em qualquer pa s da UE est em conformidade com o estabelecido nas seguintes directivas comunit rias 2006 42 CE Esta directiva subst...

Страница 3: ...av Ray Neilson p Belle gruppen hovedkontor adresse som er angitt ovenfor Me Belle Group Sheen UK Sheen Nr Buxton Derbyshire SK17 0EU GB todistaa ett jos tuote on kuvattu t m n todistuksen ostetaan va...

Страница 4: ...WDV NDLS DSUD WD LR VHUWLILNDWR SLUNWL L OHLG LDPD HOOH IUDNFLMRV DWVWRYDV SDJDO MLV DWLWLQND LXRV GLUHNW YDV L GLUHNW YD SDNHL LD LUHNW Y HOHNWURPDJQHWLQLR VXGHULQDPXPR GLUHNW YRV VX SDNHLWLPDLV SDGD...

Страница 5: ...1HLOVRQ QD ODYQRP HOOH JUXSH 2IILFH DGUHVX NRMD MH QDYHGHQR JRUH L Belle Group Sheen UK Sheen Nr Buxton Derbyshire SK17 0EU GB HOOH URXS HU U Q EX VHUWLILND LoLQGH Do NODQDQ EXUDGD GD WDVGLN 7 LoLQGH...

Страница 6: ...g Guide 10 Servicing 10 11 Warranty 11 Declaration of Conformity 2 Belle Group reserves the right to change machine speci cation without prior notice or obligation This manual has been written to help...

Страница 7: ...Machine Length mm 1400 1400 B Machine Width mm 650 650 C Machine Height mm 1000 1000 Engine Type Honda GX120 4Hp N A Engine Power Hp 4 0 2 9 kW N A Motor Power kW N A 2 2 Maximum Torque rpm 115 115 Ma...

Страница 8: ...she fully understands how to operate this equipment safely If you are unsure about the safe and correct use of the Pro 600X consult your supervisor or Belle Group Health And Safety GB Vibration Some...

Страница 9: ...ion Guiding the trowel on the slab is very simple Get into the operator s position behing the centre of the handle attain a good footing and apply the throttle slowly until desired speed is obtained A...

Страница 10: ...s and lock washers on each trowel arm and remove the blades Before installing new blades clean all concrete cement from bottom and side of the trowel be sure trowelling edge of the blade is behind tro...

Страница 11: ...Alterations additions or repairs carried out by persons other than Belle Group or their recognised agents 3 Transportation or shipment costs to and from Belle Group or their recognised agents for rep...

Отзывы: