background image

9

Pre-start Checks

GB

Pre start-up inspection.

The following Pre-start-up inspection must be performed before the start of each work session or after every four hours of use,
whichever is 

¿

 rst. Please refer to the service section for detailed guidance. If any fault is discovered, the Pro 600X must not be used 

until the fault is recti

¿

 ed.

1.   Thoroughly inspect the Pro 600X for signs of damage. Check components are present and secure. Pay special attention to the  
 

Drive Belt safety guard 

¿

 tted between the engine and gearbox unit.

2.   Check 

À

 uid lines, hoses 

¿

 ller openings, drain plugs and any other areas for signs of leakage. Fix any leaks before operating.

3.  Check the engine oil level and top up as necessary.
4.   Check the engine fuel level and top up as necessary.
5.  Check for fuel and oil leaks.

Operating Instructions

GB

Petrol Machines
Starting Procedure

•  Be sure the fuel tank is full. Use the recommended fuel to run the engine  
 

from 

its 

instruction 

booklet. 

     

•  Check engine oil levels . 

 

 

 

 

•  Turn the engines stop switch clockwise to the position ‘I’.   

 

• 

Open 

the 

fuel 

cock. 

      

•  Set the speed control lever 1/3 of the way towards the high speed    
 

position. 

       

•  If the engine is warm of the ambient temperature is high, close the    
 

choke lever half way, or keep it open fully. If the engine is cold, or the  

 

ambient temperature is low, close the choke lever.  

 

•  Pull the starter handle slowly until the resistence is felt. Return the    
 

handle to its original position and pull swiftly. 

 

 

 

•  Allow a longer warm up period in colder temperatures.

Operation

 

 

 

 

 

 

 

 

•  Guiding the trowel on the slab is very simple. Get into the operator’s  
 

position behing the centre of the handle, attain a good footing and apply  

 

the throttle slowly until desired speed is obtained. (A) 

 

 

•  Push handle down and machine will move to the right (B). lift the handle up and the machine will move to the left (C) 
•  Slightly twist to the left and the machine will move to the left. The machine will remain stationary if you do not apply any force up  
 or 

down.

Stopping the Engine

 

 

 

 

 

 

 

 

 

 

 

 

 

• 

Never use the choke to stop the engine. Leave the machine run at an idle speed for 2-3 minutes to cool down . 

 

• 

Move the Gas lever to minimum throttle. Turn the button, which is on the petrol engine, to the OFF position to stop the  

 

 machine 

lastly.

Electric Machines
Starting Procedure

• 

Insert the plug into its place.

• 

Select the rotation direction.

• 

Put safety/stop switch on “ON” position and turn direction switch on position ”1” 

¿

 rst. If the machine does not start and just makes a

 

noise, that shows you select the wrong direction of rotation. Stop the machine switch on to position “2” and continue the same way.

Operation

• 

Get into the operator’s position behind the center of handle attain a good footing and get starting. (A)

• 

Push handle down to move the machine right (B), lift handle up to move the machine left gently. (C)

• 

The machine will remain stationary, it you do not apply any force up and /or down. 

Stopping the Motor

• 

Put direction switch on “0” position and get the plug out. 

• 

Do not leave the machine before getting the plug out.

(Note: The illustration above is of the Pro 900, but the instructions are correct for the Pro 600X)

Before you operate or carry out any maintenance on this machine YOU MUST READ  and STUDY
this manual. 

WARNING

Содержание BELLE PR0 600X

Страница 1: ...0 20001 3 09 17 Operators Manual Operators Manual Manuel De L Op rateur Manual del Operador Manual de Opera o Handleiding Betjeningsvejledning Bedienungshandbuch Manuale Dell Operatore Bruksanvisning...

Страница 2: ...ertificado foi adquirido a um distribuidor autorizado do Belle Group em qualquer pa s da UE est em conformidade com o estabelecido nas seguintes directivas comunit rias 2006 42 CE Esta directiva subst...

Страница 3: ...av Ray Neilson p Belle gruppen hovedkontor adresse som er angitt ovenfor Me Belle Group Sheen UK Sheen Nr Buxton Derbyshire SK17 0EU GB todistaa ett jos tuote on kuvattu t m n todistuksen ostetaan va...

Страница 4: ...WDV NDLS DSUD WD LR VHUWLILNDWR SLUNWL L OHLG LDPD HOOH IUDNFLMRV DWVWRYDV SDJDO MLV DWLWLQND LXRV GLUHNW YDV L GLUHNW YD SDNHL LD LUHNW Y HOHNWURPDJQHWLQLR VXGHULQDPXPR GLUHNW YRV VX SDNHLWLPDLV SDGD...

Страница 5: ...1HLOVRQ QD ODYQRP HOOH JUXSH 2IILFH DGUHVX NRMD MH QDYHGHQR JRUH L Belle Group Sheen UK Sheen Nr Buxton Derbyshire SK17 0EU GB HOOH URXS HU U Q EX VHUWLILND LoLQGH Do NODQDQ EXUDGD GD WDVGLN 7 LoLQGH...

Страница 6: ...g Guide 10 Servicing 10 11 Warranty 11 Declaration of Conformity 2 Belle Group reserves the right to change machine speci cation without prior notice or obligation This manual has been written to help...

Страница 7: ...Machine Length mm 1400 1400 B Machine Width mm 650 650 C Machine Height mm 1000 1000 Engine Type Honda GX120 4Hp N A Engine Power Hp 4 0 2 9 kW N A Motor Power kW N A 2 2 Maximum Torque rpm 115 115 Ma...

Страница 8: ...she fully understands how to operate this equipment safely If you are unsure about the safe and correct use of the Pro 600X consult your supervisor or Belle Group Health And Safety GB Vibration Some...

Страница 9: ...ion Guiding the trowel on the slab is very simple Get into the operator s position behing the centre of the handle attain a good footing and apply the throttle slowly until desired speed is obtained A...

Страница 10: ...s and lock washers on each trowel arm and remove the blades Before installing new blades clean all concrete cement from bottom and side of the trowel be sure trowelling edge of the blade is behind tro...

Страница 11: ...Alterations additions or repairs carried out by persons other than Belle Group or their recognised agents 3 Transportation or shipment costs to and from Belle Group or their recognised agents for rep...

Отзывы: