31
Fascias and Capping
Now you can fit the capping working your way around the building. As you position each one, line
the end up with the outer point of the joint between fascias (diagram 51). When you are happy fix in
position with 50mm countersunk stainless steel screws. Only fix the bottom screw for
now as you will want to fix the top screw next, when all have been spaced equally.
38mm
Diagram 48
Before you can fix the roof capping in place you need to trim it to length (the full length capping is
used on the optional slatted roof). Trim 10 pieces at the end with the bevel so the square end that
goes at the bottom of the roof is kept tidy and pre-treated. Follow the diagrams 48 and 49 for
quantities and lengths.
DO NOT CUT THESE IF YOU HAVE A SLATTED ROOF
AB0056
10
Dia. 51
Quantity: 8
120mm
Diagram 49
AB0056
Quantity: 2
50mm
Drill pilot hole
Diagram 50