50
•
MN-35947
•
Rev 22
•
10/22
•
Combitherm® CT PROformance™ and CT Classic Series Installation Manual
Inspection Checklist
Unit Information
Business
Name:
______________________________________
Model
Number:
______________________________________
Serial
Number:
_______________________________
Monthly Inspection Start Date: _______________________________
Monthly Inspection Checklist
Inspect/Test - Proper draining of the oven cavity
Inspect - All drain lines for leaks or clogs
EB
Descale the steam generator
Inspect - Oven cavity for any signs of scale buildup
Descale the oven interior
Inspect ventless hood paper filter (replace as needed)
Test ventless hood drain for proper drainage and signs of leaking
Employee initials
Component Malfunction & Replacement
Summarize any component failure(s) that may have occurred during this month.
EB
Electric boiler units only
Monthly Inspection