Connection of extraction system(customer side!)
© ALTENDORF 2007
22
5.6
Connection of extraction
system
(customer side!)
The dust emission values – measured in
accordance with the “Principles for Testing Dust
Emission (Workplace-Related Dust Concentration)
from Woodworking Machines” issued by the
German trade association's technical committee for
wood – are under 2 mg/m
3
. When the machine is
attached to a correctly functioning extraction
system with an air speed of at least 20 m/s
(measured at the connection socket) you can
assume it is and will stay compliant with the
technical reference concentration (TRK) value for
wood dust that is in force in Germany. For perfect
and safe operation, the machine must be
connected to the extraction system at the extraction
sockets (rear of machine frame and safety hood
support). The minimum air speed at the extraction
sockets must be 20 m/s. The 80 mm extraction
hose from the hood to the connection socket on the
support tube is not supplied as standard. The
extraction socket and hoses are not supplied as
standard!
In addition, make sure that the extraction system is
switched on together with the machine. For this,
you can use the existing potential-free contact
(POT - refer to circuit diagram) or a current
transformer installed in the supply line.
.
5.7
Rip fence
5.7.1 Installing the table
length
extension
–
Guide the bolts of the table length extension
into the side holes of the table plate
–
Secure loosely to the table plate with two M10
nuts and shake proof washersn
–
Push through the tensioning pins
–
Tighten the M10 nuts
5.7.2 Installation of the rip fence
–
Guide the stop bar with the threaded bolts into
the holes in the table plate
–
Install the washers and nuts
–
Tighten the nuts
–
Install the belt scale
–
Push on the fence
–
Install the fence scale