AIR LOGIC POWER SYSTEMS (ALPS)
GETTING STARTED
FLEX PITCH
QUICK-START MANUAL
12
TM 2012-005 REV00 © 7/24/2012
Section 4: Getting Started
Ensure the Following Tasks are Complete:
Main Electrical Power
Switch on
The main power switch is located at the front of the enclosure.
Air Supply
Hook up air supply and make sure Air on/off switch is in the on position
The Air Sensor and Regulator unit is on backside of machine.
Air Supply Description Table
Air Pressure
Verify
The gauge should be set to 80 psi. Turn the
adjustment ring to vary the outgoing air pressure
ITEM
FEATURE
DESCRIPTION
1
Primary Particulate Filter.
Cleans and regulates incoming, compressed air
supply.
2
Coalescing Air Filter
Cleans and regulates incoming, compressed air
supply.
3
Incoming Air Regulator
Manual regulator for the main air supply.
ON
(I)
OFF
(0)
Содержание FlexPitch
Страница 2: ...AIR LOGIC POWER SYSTEMS ALPS NOTICES ...