AIR LOGIC POWER SYSTEMS (ALPS)
: THEORY of OPERATION
FLEX PITCH
QUICK-START MANUAL
11
TM 2012-005 REV00 © 10/16/2012
Reject and Reject Verify PE’s Introduction
Reject Cylinder
When a container is deemed defective the Reject Cylinder will eject the defective container from the line.
Secondary Reject Nozzle (optional)
The Secondary Reject Nozzle will blow air and eject all containers, when the system is in alarm.
Reject Verify Photo-Eye (optional)
When the container is defective, a reject cylinder kicks it off the line. The container is supposed to fall through the
reject chute and into the reject bin. The reject verify PE detects the container being ejected. If the rejected container
fails to break the reject verify photo-eye beam, then a reject verification fault occurs, and the machine will stop. If
the container became lodged on the conveyor or the reject cylinder was defective the container can be retrieved
and disposed of it in the proper manner. The Reject, Secondary Reject, and Reject Verification can be enabled or
disabled in the Settings screen for Reject Verification.
Note: If a Reject Verification Failure occurs, any defective containers must be removed from
the line manually!
Reject Verification Photo-Eye
Reject
Verification
Sensor
Reject
Verification
Reflector
Reject Cylinder