A PD9B01M3 1ST ISSUE 23/07/2020
LIST OF VALID PAGES
This Manual is made by 34 pages (including the annexes), original and emended pages are herein
listed:
DOCUMENT REVISION SUMMARY
REVISION
DATE
CHANGES
0
1/07/2019
-Document issue
1
17/06/2020
-Definition of primary and secondary structures
-List of materials for quick repairs
2
25/06/2020
- aircraft TBO definition at 2000h
3
23/07/2020
Definition of special tools , placard and markings
Table 1: history of document revisions
CAUTION
THIS MANUAL IS VALID ONLY IF IT CONTAINS ALL OF THE ORIGINAL AND REVISED
PAGES LISTED ABOVE. EACH PAGE TO BE REVISED MUST BE REMOVED, SHREDDED
AND LATER REPLACED WITH THE NEW, REVISED PAGE IN THE EXACT SAME PLACE IN
THE MANUAL.